Other Units

Tyre Cleaning Unit

All trucks inside the facility will not leave the area without washing the tyres.

Temporary Waste Storage Area

Wastes such as electronics, waste oil and batteries will be stored in the area.

Water Storage

It is made of 200 m³ capacity for use in 13 fire hydrants located around the facility and the water to be used in the facility.

The energy requirement of the plant has been met by the medium-medium voltage line drawn from the village of Musabeyli, which is 2.5 km away. The facility has a 400 kw transformer and 250 kw generator, which is dedicated to the landfill with 400 kw transformer and 400 kw generator.

ADMINISTRATIVE BUILDING AREA

The property has a 200 m² building, which is ready to be used as an administrative building for the needs of the employees.

All roads are covered with asphalt.

Rain water drainage channels have been formed around the facility.

After the management Tender of EDİKAB

Electricity generation systems will be installed by the contractor company in addition to the current situation. Thanks to this system, electricity from methane gas coming out of the waste will be produced and it will be given to the economy and share will be given to EDİKAB.

The web-site is co-funded by the European Union trough the Bulgaria–Turkey IPA Cross-border Programme This publication has been produced with the assistance of the European Union.

The contents of this publication are the sole responsibility of Edirne Solid Waste Management Union (EDİKAB) and can in no way be taken to reflect the views of the European Union